Texas Instruments TPS566238EVM Converter Evaluation Module

Texas Instruments TPS566238EVM Converter Evaluation Module (EVM) is used to evaluate the TPS566238 device. The TPS566238 is a cost effective, high-voltage input, synchronous buck converter with integrated FETs. The TPS566238 operates with wider supply input voltage ranging from 3V to 18V. It uses DCAP3™ control mode to provide a fast transient response, good line, load regulation, no requirement for external compensation, and supports low ESR output capacitors. The Texas Instruments TPS566238 is a high efficiency converter, and provides complete protection OVP, UVP, OCP, OTP.

Features

  • 3V to 18V input voltage range
  • 0.6V to 7V output voltage range
  • Up to 6A output current
  • Large duty operation
  • Fast transient response
  • 2mm x 1.5mm RQF package

Board Layout

Mechanical Drawing - Texas Instruments TPS566238EVM Converter Evaluation Module
Published: 2021-03-02 | Updated: 2022-03-11