80 Position Cable Assemblies

Results: 1.399
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Cable Length Pitch Voltage Rating
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 254 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 254 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 304.8 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 330.2 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 1.016 m 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Plug 80 Position Socket 80 Position 177.8 mm 1.27 mm
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1
Socket 80 Position Socket 80 Position 82.55 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1
Socket 80 Position Socket 80 Position 254 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 152.4 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 254 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 254 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 609.6 mm 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 1.828 m 1.27 mm 280 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 82.55 mm 1.27 mm 313 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 2702 mm 1.27 mm 313 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 304.8 mm 1.27 mm 313 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 2702 mm 1.27 mm 313 VAC
Samtec Rectangular Cable Assemblies .050 Tiger Eye Double Row Discrete Wire Cable Assembly Non-Stocked Lead-Time 14 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 482.6 mm 1.27 mm 313 VAC
Molex Specialised Cables NEXTSTREAM PCIE GEN6 ASSY Non-Stocked Lead-Time 18 Weeks
Min.: 1
Mult.: 1

Plug 80 Position Plug 80 Position 500 mm 30 VAC, 30 VDC
Molex Specialised Cables NEXTSTREAM PCIE GEN6 ASSY Non-Stocked Lead-Time 18 Weeks
Min.: 1
Mult.: 1

Plug 80 Position Plug 80 Position 300 mm 30 VAC, 30 VDC
Molex Specialised Cables NEXTSTREAM PCIE GEN6 ASSY Non-Stocked Lead-Time 19 Weeks
Min.: 1
Mult.: 1

Plug 80 Position Plug 80 Position 500 mm 30 VAC, 30 VDC
TE Connectivity Ethernet Cables / Networking Cables QSFP TO [4]SFP25GIG 30AWG 3 METER Non-Stocked Lead-Time 25 Weeks
Min.: 40
Mult.: 40

Plug 38 Position Plug 80 Position 3 m (9.843 ft)
TE Connectivity Ethernet Cables / Networking Cables QSFP TO [4]SFP 25GIG 26AWG 4 METER Non-Stocked Lead-Time 26 Weeks
Min.: 50
Mult.: 50

Plug 38 Position Plug 80 Position 4 m (13.123 ft)
HARTING Ribbon Cables / IDC Cables har-flex female 80pin Cable Assembly (AWG30/7 PVC), double ended (similar cable direction), w/ strain relief, PL1, 0.2m Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Socket 80 Position Socket 80 Position 200 mm
Samtec Ribbon Cables / IDC Cables 0.80 mm Q Strip Coax Cable Assembly Non-Stocked Lead-Time 4 Weeks
Socket 80 Position Plug 80 Position 43.688 mm 0.8 mm