QFN-20 Reel Semiconductors

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Skyworks Solutions, Inc. RF Front End 2.4GHz 802.11bgn 3.3Volt -40C +85C Non-Stocked Lead-Time 17 Weeks
Min.: 3.000
Mult.: 3.000
: 3.000

Skyworks Solutions, Inc. RF Switch ICs 2.5x2.5 SP10T Dual MIPI Diversity Switch Non-Stocked Lead-Time 18 Weeks
Min.: 3.000
Mult.: 3.000
: 3.000

Ampleon RF MOSFET Transistors B10G2327N55D/PQFN/REELDP Non-Stocked Lead-Time 13 Weeks
Min.: 500
Mult.: 500
: 500

Ampleon RF MOSFET Transistors BLM10D2327-40AB/SOT1462/REELDP Non-Stocked Lead-Time 13 Weeks
Min.: 2.000
Mult.: 2.000
: 2.000

Ampleon RF MOSFET Transistors BLM10D2327-40AB/SOT1462/REELDP Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1
: 500

Ampleon RF MOSFET Transistors BLM9D1822-30B/SOT1462/REELDP Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1
: 500

Ampleon RF MOSFET Transistors BLM9D2327-26B/SOT1462/REELDP Non-Stocked Lead-Time 13 Weeks
Min.: 2.000
Mult.: 2.000
: 2.000

Monolithic Power Systems (MPS) Battery Management 3A Switching Charger /Manag. for Li Cell Non-Stocked Lead-Time 57 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Battery Management 3A Single Cell Switching Charger Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 5.000

Monolithic Power Systems (MPS) Battery Management 2A Switching Charger Non-Stocked Lead-Time 64 Weeks
Min.: 500
Mult.: 500
: 500

Monolithic Power Systems (MPS) Switching Controllers 4V-40V Input Current Mode Sync StpDwn Con Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Switching Voltage Regulators 4-Channel, Max 150mA/Channel, Boost WLED Driver with High Dimming Ratio Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 500
Monolithic Power Systems (MPS) Switching Voltage Regulators 4-Channel, Max 150mA/Channel, Boost WLED Driver with High Dimming Ratio Non-Stocked Lead-Time 57 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) LED Lighting Driver ICs 4-Ch 75V WLED Controller with I2C for LCD Backlight Non-Stocked Lead-Time 30 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) LED Lighting Driver ICs 4-String, 80V Output, WLED Controller with I2C Interface Non-Stocked Lead-Time 30 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 19A, 600kHz, 22V Output Range, Synchronous Boost Converter with Input Disconnect Function Non-Stocked Lead-Time 57 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 15A 16V 400kHz Step Dwn w/Sync Gate Drvr Non-Stocked Lead-Time 44 Weeks
Min.: 500
Mult.: 500
: 500

Monolithic Power Systems (MPS) Switching Voltage Regulators 15A 16V 400kHz Step Dwn w/Sync Gate Drvr Non-Stocked Lead-Time 37 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 15A 28V 100kHz Step Dwn w/Sync Gate Drvr Lead-Time 44 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Switching Voltage Regulators 15A 28V 100kHz Step Dwn w/Sync Gate Drvr Non-Stocked Lead-Time 37 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 36V, 140W, Buck-Boost with Integrated Low-Side MOSFETs, Supports High-Side Current Sense and I2C Interface Non-Stocked Lead-Time 64 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000
Monolithic Power Systems (MPS) Switching Voltage Regulators 45V, 6A, Low Iq Synchronous Step-Down Converter with Frequency Spread Spectrum Non-Stocked Lead-Time 64 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 45V, 6A, Low IQ, Synchronous Step-Down Converter Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators Automotive Grade, 45V, 6A, FSS, Low IQ, Synchronous Step-Down Converter, Wettable Flank Non-Stocked Lead-Time 71 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Monolithic Power Systems (MPS) Switching Voltage Regulators 3.5A 36V Sync Step Down Converter Non-Stocked Lead-Time 44 Weeks
Min.: 500
Mult.: 500
: 500