20 mA Semiconductors

Results: 750
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Nexperia Logic Gates 74VHCT08BQ-Q100/SOT762/DHVQFN1 Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1
: 3.000

Nexperia Logic Gates 74VHCT08D-Q100/SOT108/SO14 Non-Stocked Lead-Time 24 Weeks
Min.: 2.500
Mult.: 2.500
: 2.500

Nexperia Logic Gates 74VHCT08PW-Q100/SOT402/TSSOP14 Non-Stocked Lead-Time 24 Weeks
Min.: 1
Mult.: 1
: 2.500

Nexperia Logic Gates 74AUP2G57GU-Q100/SOT1160/XQFN1 Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1
: 4.000

Qorvo Motor/Motion/Ignition Controllers & Drivers 40V/20W Motor Controllers/Drivers(Produ Non-Stocked Lead-Time 20 Weeks
Min.: 3.000
Mult.: 3.000
: 3.000

Richtek Power Management IC Development Tools Evaluation board for RT4533GJ6 Non-Stocked
Min.: 1
Mult.: 1

Nisshinbo Switching Voltage Regulators PWM/VFM Step-up DCDC Converter for White LED Non-Stocked Lead-Time 16 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Nisshinbo Switching Voltage Regulators PWM/VFM Step-up DCDC Converter for White LED Non-Stocked Lead-Time 16 Weeks
Min.: 5.000
Mult.: 5.000
: 5.000

Torex Semiconductor LED Lighting Driver ICs Step up DC/DC Converter - Backlight LED Driver Non-Stocked
Min.: 3.000
Mult.: 3.000
: 3.000

Torex Semiconductor Switching Controllers 2ch. Step-Down / Inverting DC/DC Controller IC Non-Stocked
Min.: 1.000
Mult.: 1.000
: 1.000


Torex Semiconductor Switching Controllers 2ch. Step-Down / Inverting DC/DC Controller IC Non-Stocked
Min.: 1.000
Mult.: 1.000
: 1.000

Power Integrations Power Management IC Development Tools LNK3202D Design Kit 85-277 VAC 2.8V 20mA Non-Stocked
Min.: 1
Mult.: 1

Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP1518 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP1528 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3306 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3312 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3389 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3389 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3399 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP3399 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Development Tools Evaluation Board for MP6001 Non-Stocked Lead-Time 23 Weeks
Min.: 1
Mult.: 1
Monolithic Power Systems (MPS) LED Lighting Driver ICs 6 LED, 2.6 - 6Vin Switch Driver Lead-Time 37 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs 6 LED, 2.6 - 6Vin Switch Driver Non-Stocked Lead-Time 30 Weeks
Min.: 1
Mult.: 1
: 5.000

Monolithic Power Systems (MPS) LED Lighting Driver ICs 6 LED, 2.6 - 6Vin Switch Driver Non-Stocked Lead-Time 37 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) LED Lighting Driver ICs 6 LED, 2.6 - 6Vin Switch Driver Non-Stocked Lead-Time 30 Weeks
Min.: 3.000
Mult.: 3.000
: 3.000