30 mm Resistors

Results: 910
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Termination Style Resistance Power Rating Tolerance Temperature Coefficient
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 12R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 12 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 13R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 13 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 160R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 160 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 16R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 16 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1K3 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.3 kOhms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1K6 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.6 kOhms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1K8 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.8 kOhms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1R1 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.1 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1R2 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.2 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1R3 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.3 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1R6 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.6 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 1R8 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 1.8 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 200R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 200 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 20R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 20 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 240R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 240 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 24R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 24 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 2K0 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 2 kOhms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 2K4 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 2.4 kOhms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 2R0 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 2 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 2R4 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 2.4 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 300R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 300 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 30R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 30 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 36R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 36 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 39R (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 39 Ohms 10 W 5 % 300 PPM / C
TE Connectivity / CGS Wirewound Resistors - Through Hole SQMB10 3R0 (WIRE) 5% Non-Stocked Lead-Time 19 Weeks
Min.: 1.200
Mult.: 1.200

Radial 3 Ohms 10 W 5 % 300 PPM / C