Hardware

Results: 4.315
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Banner Engineering Sensor Fixings & Accessories WORLD-BEAM QS18 Series: 6 Beam Sensor Array; Polarized Retro; Range: 1 m; Input: 10-30 V dc; Outputs: Bipolar NPN and PNP Dark Operate; 150 mm (6 in) 4-pin M12 Pigtail QD Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1
Cynergy3 Sensor Fixings & Accessories G3/8 (BSP) 1000mm long extension tube Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Banner Engineering Sensor Fixings & Accessories Bracket: For Use with PTL110; 28 mm Pipe Clip Clamp Bracket; 300 Series Stainless Steel (Hardware Included) Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Banner Engineering Sensor Fixings & Accessories 3SBG SCAN. BLK. MULTIBEAM Lead-Time 3 Weeks
Min.: 1
Mult.: 1
Banner Engineering Sensor Fixings & Accessories Bracket: Right-angle SMBAMS series with 70 x 40 mm space for label; 30 mm hole for mounting sensor; Articulation slots for 90 plus degree rotation; 12-ga. (2.6 mm) Cold-rolled Steel Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Eaton Electrical Sensor Fixings & Accessories IND PROX RECEPTACLE ONLY Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Eaton Electrical Sensor Fixings & Accessories CONTROL,SELF-POWERED,115VAC, 70-SERIES Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Banner Engineering Sensor Fixings & Accessories Bracket: Sensor Mounting - PVL Array; Right-Angle; Mounting Reflector Outside Bin; Material: Clear Zinc Plated Steel Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Banner Engineering Sensor Fixings & Accessories Accessory: 300 mm Elevated-Use Stand-Off Pipe (3/4 in NPT); Material: Anodized Aluminum (BLACK); 3/4 NPT Thread At Both Ends; Compatible With Most Industrial Environments Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Carlo Gavazzi Sensor Fixings & Accessories ELECTRODE EXTENTION 1000MM Non-Stocked Lead-Time 10 Weeks
Min.: 5
Mult.: 1

Carlo Gavazzi Sensor Fixings & Accessories PROG. ADAP. GAP1605 TO SENSOR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Cynergy3 Sensor Fixings & Accessories Cable PUR with straight M12 connector 10M Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Cynergy3 Sensor Fixings & Accessories Cable PUR with straight M12 connector 2M Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

TE Connectivity / Measurement Specialties Sensor Fixings & Accessories ROD CORE #4-40 36INL Non-Stocked Lead-Time 2 Weeks
Min.: 25
Mult.: 1

Telemecanique Sensor Fixings & Accessories FLOAT SWITCH 1 3/4IN ROD G+H Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
Telemecanique Sensor Fixings & Accessories PRESSURE SWITCH ACCS 3 1/4 in. ROD SS Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
ABB Sensor Fixings & Accessories REFLECT 1-REFLECTOR 63MM Non-Stocked
Min.: 1
Mult.: 1
Carlo Gavazzi Sensor Fixings & Accessories MAGNET Non-Stocked
Min.: 1
Mult.: 1
Altech 9512-6010
Altech Sensor Fixings & Accessories CABLE-2M-64 DC-90-4PIN Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
Telemecanique Sensor Fixings & Accessories FLUSH ACCESSORY FOR XUB CYLINDRIC PHOTOS Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1
Panasonic Industry Sensor Fixings & Accessories Flat Attachment for Rc 1/8 female thread Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Eaton Electrical Sensor Fixings & Accessories FIBEROPTIC ADAPTER Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1
Advanced Energy / Trek Sensor Fixings & Accessories Model 152P-CR-1 Test Plates
Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Banner Engineering Sensor Fixings & Accessories MAXI-BEAM: Logic Module; Pulse Logic; ONE-shot or Delayed ONE-shot; (15 sec. Max.)
Lead-Time 4 Weeks
Min.: 1
Mult.: 1
Telemecanique Sensor Fixings & Accessories ConM12 Fem 90 8P screw terminals Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1