2 AWG Connectors

Results: 170
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Panduit Terminals 2RNG-LUG 02AWG 1/4" CU SN
50Expected 11/3/2026
Min.: 1
Mult.: 1

KS Terminals Terminals Flag, 2 AWG, 3/8"
200Expected 10/21/2026
Min.: 1
Mult.: 1

KS Terminals Terminals Pin, 2 AWG, F=24.5 mm
161Expected 9/25/2026
Min.: 1
Mult.: 1

KS Terminals Terminals Ring, 2 AWG, 5/8"
100Expected 9/25/2026
Min.: 1
Mult.: 1

Panduit Terminals Copper Compression Lug, 1 Hole, #2 AWG, Flared Barrel, 1/4 (6.4mm) Stud, 45 Bent
17Expected 11/3/2026
Min.: 1
Mult.: 1

Panduit Terminals Copper Compression Lug, 1 Hole, #2 AWG, Flared Barrel, 5/16 (7.9mm) Stud, 90 Bent
18On Order
Min.: 1
Mult.: 1

Panduit Terminals Copper Compression Lug, 2 Hole, #2 AWG, Narrow Tongue, 1/4 (6.4mm) Stud, 90 Bent
2Expected 10/5/2026
Min.: 1
Mult.: 1

Panduit Terminals Copper Compression Lug, 1 Hole, 2/0 AWG Flex, 1/2 (12.7mm) Stud, 90 Bent 10Factory Stock Available
Min.: 1
Mult.: 1


TE Connectivity Power to the Board AMP PDS BUSPLUG 125F3 SER Non-Stocked Lead-Time 9 Weeks
Min.: 7.500
Mult.: 7.500

TE Connectivity Heavy Duty Power Connectors HCM250-MC-35 Non-Stocked Lead-Time 11 Weeks
Min.: 20
Mult.: 20

TE Connectivity / AMP Heavy Duty Power Connectors HCM250-MC-70 Non-Stocked Lead-Time 11 Weeks
Min.: 20
Mult.: 20

TE Connectivity Heavy Duty Power Connectors HCM250-FC-35 Non-Stocked Lead-Time 12 Weeks
Min.: 20
Mult.: 20

TE Connectivity / AMP Heavy Duty Power Connectors HCM250-FC-50 Lead-Time 12 Weeks
Min.: 1
Mult.: 1

TE Connectivity / AMP Heavy Duty Power Connectors HCM250-FC-70 Non-Stocked Lead-Time 12 Weeks
Min.: 20
Mult.: 20



TE Connectivity / AMP Heavy Duty Power Connectors HCM250-MC Lead-Time 12 Weeks
Min.: 1
Mult.: 1



TE Connectivity / AMP Heavy Duty Power Connectors HCM250-FC Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Phoenix Contact DIN Rail Terminal Blocks UKH 150 BU 1000V Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 plug, W key, 35sq,w/o HVIL Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 plug, X key, 35sq,w/o HVIL, no shielding Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 plug, Z key, 35sq,w/o HVIL Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 plug, N key, 35sq,w/ HVIL, no shielding Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 plug, y key, 35sq,w/ HVIL, no shielding Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 RA plug, W key, 35 sq,w/o HVIL, no shielding ring Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 RA plug, y key, 35sq,w/ HVIL Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1

Amphenol Industrial Heavy Duty Power Connectors TS1 8.0 RA plug, Z key, 35 sq,w/ HVIL, no shielding ring Non-Stocked Lead-Time 12 Weeks
Min.: 100
Mult.: 1