|
|
Power Distribution Blocks DIN Distribution Block, Screw, 20 I/ O
- CMDB4/10/DB
- Altech
-
1:
18,11 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB410DB
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 20 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
20 Position
|
|
32 A, 35 A
|
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
- CMDB4/3/BU
- Altech
-
1:
10,53 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB43BU
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
6 Position
|
|
32 A, 35 A
|
Blue
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
- CMDB4/3/W
- Altech
-
1:
10,53 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB43W
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
6 Position
|
|
32 A, 35 A
|
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 8 I/ O
- CMDB4/4/R
- Altech
-
1:
13,08 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB44R
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 8 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
8 Position
|
|
32 A, 35 A
|
Red
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 4 I/ O
- CMDB6/2/W
- Altech
-
1:
9,31 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB62W
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 4 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
41 A, 50 A
|
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 4 I/ O
- CMDB6/2/Y
- Altech
-
1:
9,31 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB62Y
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 4 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
41 A, 50 A
|
|
Screw
|
|
|
|
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
- CMDB6/3/Y
- Altech
-
1:
12,75 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CMDB63Y
|
Altech
|
Power Distribution Blocks DIN Distribution Block, Screw, 6 I/ O
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
6 Position
|
|
41 A, 50 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks F/T Spring Clamp
- CSC2.5T
- Altech
-
1:
1,08 €
-
Non-Stocked
|
Mouser Part No
845-CSC2.5T
|
Altech
|
DIN Rail Terminal Blocks F/T Spring Clamp
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
2 Position
|
|
24 A
|
Gray
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks Feed-thru Termblock
- CSC4T1-2
- Altech
-
1:
2,11 €
-
Non-Stocked
|
Mouser Part No
845-CSC4T1-2
|
Altech
|
DIN Rail Terminal Blocks Feed-thru Termblock
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
2 Position
|
|
32 A
|
Gray
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks Feed-thru Termblock
- CSC4T2-2
- Altech
-
1:
2,55 €
-
Non-Stocked
|
Mouser Part No
845-CSC4T2-2
|
Altech
|
DIN Rail Terminal Blocks Feed-thru Termblock
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
2 Position
|
|
32 A
|
Gray
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Stud M4, Feed-Thru
- CSTSB4U
- Altech
-
1:
4,74 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CSTSB4U
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Stud M4, Feed-Thru
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
65 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Stud M5, Feed-Thru
- CSTSB5U
- Altech
-
1:
5,20 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CSTSB5U
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Stud M5, Feed-Thru
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
80 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck 6mm10A
- CTL2.5U-H(L)
- Altech
-
1:
4,85 €
-
Non-Stocked
|
Mouser Part No
845-CTL2.5U-HL
|
Altech
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck 6mm10A
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
6 Position
|
|
25 A
|
Green / Yellow
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck
- CTL2.5U-H(L)110
- Altech
-
1:
10,34 €
-
Non-Stocked
|
Mouser Part No
845-CTL2.5U-HL110
|
Altech
|
DIN Rail Terminal Blocks 3 Wire Snsr Trm Blck
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
6 Position
|
|
25 A
|
Green / Yellow
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks F/T term block
- CTS10U/O
- Altech
-
1:
2,01 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CTS10U/O
|
Altech
|
DIN Rail Terminal Blocks F/T term block
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
2 Position
|
|
65 A
|
Orange
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Feed-Thru
- CTS16U/BG
- Altech
-
1:
4,18 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CTS16U/BG
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Feed-Thru
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
|
|
76 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks F/T term block
- CTS50U
- Altech
-
1:
9,23 €
-
Non-Stocked
|
Mouser Part No
845-CTS50U
|
Altech
|
DIN Rail Terminal Blocks F/T term block
|
|
Non-Stocked
|
|
Min.: 1
Mult.: 1
|
|
|
|
150 A
|
Gray
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4/DB
- Altech
-
1:
5,77 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4/DB
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4/O
- Altech
-
1:
5,77 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4/O
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Orange
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4/Y
- Altech
-
1:
5,77 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4/Y
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Yellow
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4(I.S)/BL
- Altech
-
1:
6,79 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4I.SBL
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Black
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4(I.S)/BU
- Altech
-
1:
6,79 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4I.SBU
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Blue
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4(I.S)/DB
- Altech
-
1:
6,79 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4I.SDB
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4(I.S)/G
- Altech
-
1:
6,79 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4I.SG
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Green
|
Screw
|
|
|
|
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
- CYDL4(I.S)/O
- Altech
-
1:
6,79 €
-
Non-Stocked Lead-Time 13 Weeks
|
Mouser Part No
845-CYDL4I.SO
|
Altech
|
DIN Rail Terminal Blocks DIN Term Blk, Screw, Dbl Level
|
|
Non-Stocked Lead-Time 13 Weeks
|
|
Min.: 1
Mult.: 1
|
|
4 Position
|
|
32 A
|
Orange
|
Screw
|
|
|