XC Standard & Application-Specific Limit Switches

Telemecanique XC Standard and Application-Specific Limit Switches feature a comprehensive range of IEC limit switches with proven robustness and reliability. This portfolio is designed for easy product selection, installation, and maintenance. Telemecanique XC Standard and Application-Specific Limit Switches comply with US and international standards. These switches are ideal for industrial machines across a broad range of markets, including packaging, material handling, machine tools, railways, food and beverage, and more.

Results: 751
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Illuminated Contact Form Actuator Current Rating Voltage Rating AC Voltage Rating DC Operating Force NEMA Rating Termination Style Mounting Style IP Rating Packaging
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWTCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 600VAC 10AMP XCKJ Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP +OPT Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Telemecanique Limit Switches LIMIT SWITCH Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Non-Illuminated Bulk
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated SPDT Plunger 10 A 240 VAC 250 VDC 0.33 N 1, 2, 4, 12 Screw Conduit (1/2 in) IP66 Bulk
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated Bulk
Telemecanique Limit Switches POSITION SWITCH FIAT Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Non-Illuminated SPDT Roller Plunger 10 A 240 VAC 250 VDC 0.33 N 1, 2, 4, 12 Screw Conduit (1/2 in) IP66 Bulk
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH METAL 2CO SIM SNAP Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
Non-Illuminated
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ +OPTIONS Non-Stocked Lead-Time 11 Weeks
Min.: 6
Mult.: 1
Bulk
Telemecanique Limit Switches LIMIT SWITCH 240VAC 10AMP XCKJ +OPTIONS Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1