SWG Type RF Switch Connector Test Probes

Murata SWG Type RF Switch Connector Test Probes encompass manual and production test probes designed for testing the SWG type RF Switch Connectors. Murata's recommended pre-production manual test probe, MXHQ87WA3000, and production test probe, MM126310, for the SWG series enable reliable testing of RF circuits from the development stage to final production. SWG Type RF Switch Connectors Test Probes are suitable for inspection of RF signals up to 11GHz, enabling designers to use wider frequency bands including UWB.

All Results (17)

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS

Murata Electronics Test Probes 501In Stock
Min.: 1
Mult.: 1


Murata Electronics Test Probes 522In Stock
291Expected 12/1/2026
Min.: 1
Mult.: 1


Murata Electronics Test Connectors MANUAL TEST PROBE 346In Stock
250Expected 10/19/2026
Min.: 1
Mult.: 1


Murata Electronics Coaxial Cables 93In Stock
Min.: 1
Mult.: 1


Murata Electronics RF Cable Assemblies 61In Stock
Min.: 1
Mult.: 1


Murata Electronics RF Cable Assemblies 35In Stock
Min.: 1
Mult.: 1

Murata Electronics Test Connectors 17In Stock
Min.: 1
Mult.: 1

Murata Electronics Test Connectors 34In Stock
Min.: 1
Mult.: 1


Murata Electronics RF Cable Assemblies 50In Stock
31Expected 10/22/2026
Min.: 1
Mult.: 1


Murata Electronics Test Connectors
16Expected 11/23/2026
Min.: 1
Mult.: 1

Murata Electronics RF Connector Accessories 70Factory Stock Available
Min.: 1
Mult.: 1


Murata Electronics Test Connectors 70Factory Stock Available
Min.: 1
Mult.: 1


Murata Electronics Test Connectors 70Factory Stock Available
Min.: 50
Mult.: 50


Murata Electronics Test Connectors Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Murata Electronics RF Cable Assemblies Non-Stocked Lead-Time 8 Weeks
Min.: 100
Mult.: 100

Murata Electronics RF Cable Assemblies Non-Stocked Lead-Time 4 Weeks
Min.: 50
Mult.: 50

Murata Electronics RF Cable Assemblies Non-Stocked Lead-Time 19 Weeks
Min.: 1
Mult.: 1