Sta-Kon® Wire Terminals

ABB Installation Products Sta-Kon® Wire Terminals provide superior conductor connections and termination protection, increasing the operational efficiency and reliability of critical electrical equipment. These connector terminals use selective annealing to keep the barrel soft enough to crimp and form around the wire, while the cold-form process during manufacturing keeps the tongue strong. The long barrel design offers several benefits, such as lowering electrical resistance, preventing wire pullout, and eliminating missed crimps during installation. The elongated barrel also provides more surface area to hold the insulator tighter to the barrel, keeping it on during installation. The ring tongue terminals feature an anti-rotational tongue to keep the terminal secure in the terminal block, preventing terminal shorting. This also means an installer can place more terminals closer together without worry. ABB Sta-Kon Wire Terminals are ideal for buildings, data centers, renewable energy, and utility applications.

All Results (1.322)

Select a category below to see filtering options and narrow down your search.
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
ABB Installation Products Fixed Terminal Blocks NON-INS PRL SPLICE, 4/0, CMA 190,00 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS - TUB RING TERM, 4/0, 3/8, Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INSUL RING 4/0 AWG W/ 1/4 STUD Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals NON INS RING 3/0AN-3/0 5/16 NP Non-Stocked Lead-Time 6 Weeks
Min.: 250
Mult.: 50
ABB Installation Products Fixed Terminal Blocks NONINS TUB RNG TRM 2/0AN-4/0 BT7/16 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals NON INS RING TERM 3/0AN-4/0 NICKPLT Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS - TUB RING TERM, 250MCM, 3/ Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS PRL SPLICE, 250 MCM, CMA 23 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS FLAG TERM, 4, 3/8, METALLIC Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals NON INSUL TUB RNG TRM 4/0AN-250 Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS - TUB RING 4/0AN-250M 7/16 Non-Stocked Lead-Time 4 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS PRL SPLICE, 300 MCM, CMA 30 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS PRL SPLICE, 400 MCM, CMA 38 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals PGTL WRE JNT 3-NO12 MAX 2-NO14 MIN Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals PIGTAIL WIRE JOINT Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals PGTL WIRE JNT 3-NO12 MAX 2-NO16 MIN Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals PGTL WIRE JNT 4-NO12 MAX 3-NO18 MIN Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Fixed Terminal Blocks NON-INS PRL SPLICE, 500 MCM, CMA 47 Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals NYL INSUL FEM DISC 22-18 AWG RED Non-Stocked Lead-Time 6 Weeks
Min.: 1.000
Mult.: 1.000
ABB Installation Products Terminals INS NYL FRK TRM 22-16 NO6 RED MYLAR Non-Stocked Lead-Time 6 Weeks
Min.: 1.000
Mult.: 1.000
ABB Installation Products Terminals INS NYL FRK TRM 22-16 NO6 RED BELT Non-Stocked Lead-Time 6 Weeks
Min.: 1.000
Mult.: 1.000
ABB Installation Products Terminals EXP INS VINL FORK TERM, 22-16, NO8, Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals INS VIN FRK TRM 22-16 NO8 RED MYLAR Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals INS NYL FORK TERM 22-16 BH NO10 RED Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1
ABB Installation Products Terminals INS VIN FORK TERM 22-16 NO10 RED Non-Stocked Lead-Time 6 Weeks
Min.: 1
Mult.: 1