Select a category below to see filtering options and narrow down your search.
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 44 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 24 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 46 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 30 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 45 Weeks
Min.: 1
Mult.: 1
Reel: 100

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 24 Weeks
Min.: 1
Mult.: 1
Reel: 100

Samtec Power to the Board 5.00 mm PowerStrip/30 A Hermaphroditic Terminal/Socket Strip Non-Stocked Lead-Time 44 Weeks
Min.: 1
Mult.: 1
Reel: 100

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 46 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 22 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 15 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 46 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 47 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 47 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 38 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 33 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 25 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 22 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 18 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 13 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1

Samtec Power to the Board 5.00 mm PowerStrip/30 A Dual Leaf Socket Strip Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1