All Results (403)

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Corning 4021-M2/36/NXG
Corning Tool Kits & Cases Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1
Corning 4030
Corning Fuse Holder 80609000015 4030 AIR/HYDRAULIC CRIMPING UNIT Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1
Corning 4045-K2/36/FL/NXG
Corning Tool Kits & Cases 80611311327 4045-K2/36/FL/NXG MS2 UNIV SPL RIG W/4036-25 CRIMPER & MTG HDW Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1
Corning 4416 - 4P
Corning Adhesive Tapes Duct Sealing Kit Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1

Corning 4430-6X20
Corning Adhesive Tapes 80610031025 4430-6X20 (6" X20') SPACER WEB Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1

Corning 4430F
Corning Adhesive Tapes 80610110209 4430-F FOAM KIT Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1

Corning 4462
Corning Adhesive Tapes 80610156129 4462 SHIELD CONNECTOR Non-Stocked Lead-Time 53 Weeks
Min.: 500
Mult.: 500

Corning 4462-FN
Corning Adhesive Tapes 80610327720 4462-FN SHIELD CONNECTOR Non-Stocked Lead-Time 53 Weeks
Min.: 500
Mult.: 500

Corning 4462-SNA
Corning Adhesive Tapes 80610582118 4462-SNA SHIELD CONNECTOR WITH SHOE Non-Stocked Lead-Time 53 Weeks
Min.: 500
Mult.: 500

Corning 4464
Corning Adhesive Tapes 80610028310 4464 SHIELD CONNECTOR Non-Stocked Lead-Time 53 Weeks
Min.: 1.000
Mult.: 1.000

Corning 4604-PST
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610756191 4604-PST (4.88" X 5.25") PULL N' SHRINK TUBING Non-Stocked Lead-Time 53 Weeks
Min.: 5
Mult.: 5

Corning 4606-PST
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610756183 4606-PST (5.75" X 6.25") PULL N' SHRINK TUBING Non-Stocked Lead-Time 53 Weeks
Min.: 5
Mult.: 5

Corning 4608-PST
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610756175 4608-PST (7.25" X 7.25") PULL N' SHRINK TUBING Non-Stocked Lead-Time 53 Weeks
Min.: 5
Mult.: 5

Corning 4628-S
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610100093 4628-S PST (.500) Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 4629-S
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610102131 4629-S PST (.625) Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 4630-S
Corning Spiral Wraps, Sleeves, Tubing & Conduit 80610100119 4630-S PST (.750) Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 4634R
Corning Terminals 80610280218 4634R PST PEDESTAL SPLICE CLOSURE REENTRY KIT Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 4635R
Corning Terminals 80610280226 4635R PST PEDESTAL SPLICE CLOSURE REENTRY KIT Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 49-4X20
Corning Adhesive Tapes 80012030252 49-4X20 (4" X20') SCOTCH BRAND ALUMINUM FOIL TAPE Non-Stocked Lead-Time 53 Weeks
Min.: 50
Mult.: 50

Corning 5"DC-LHS
Corning Terminals 80610412530 5" DC-LHS BB DOUBLE PORT END CAP Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 5"SC-LHS
Corning Terminals 80610412522 5" SC-LHS BB SINGLE PORT END CAP Non-Stocked Lead-Time 53 Weeks
Min.: 10
Mult.: 10

Corning 5-DS-26-BB
Corning Terminals 80610083521 5-DS-26-BB (5"X26") BB SPLIT SLEEVE Non-Stocked Lead-Time 53 Weeks
Min.: 1
Mult.: 1
Corning 5005-0
Corning Wire Labels & Markers REPLENISHMENT DECAL "0" Non-Stocked Lead-Time 53 Weeks
Min.: 1.000
Mult.: 1.000

Corning 5005-1
Corning Wire Labels & Markers REPLENISHMENT DECAL "1" Non-Stocked Lead-Time 53 Weeks
Min.: 1.000
Mult.: 1.000

Corning 5005-2
Corning Wire Labels & Markers REPLENISHMENT DECAL "2" Non-Stocked Lead-Time 53 Weeks
Min.: 1.000
Mult.: 1.000